PMO briefing
The complete PMO, and a team trained to run it
One connected system for running capital projects and portfolios: governance from the investment board to the work package, one monthly cycle on one data date, 198 controlled templates in a ready-to-use folder structure, and a 26-module PMO Academy that trains your own people to run it.
This page is the briefing. The A0 map shows the whole system on one sheet, to download and read at your leisure.
Or talk to us: 01244 267676 · enquiry@projectcentralassurance.com

At a glance
How comprehensive it is
The PMO Academy
Your own people, trained to run it
Behind the library sits a full academy: 26 modules in six families, taught on the library itself, in training copies, and on one worked-example project. A new PMO team is trained in one to two weeks and runs its first live cycle, supervised, the following month.
- E01 · 3 hExecutive briefingWhat the PMO gives decision-makers each month, and what it asks of them.Executive Sponsor, investment committee and board members, Project Directors
- F01–F10 · 26 hFoundation coreThe operating system, governance, roles, data and coding, the 10-day cycle, the integrated position, evidence to decision, the investment lifecycle, findings and lessons, mobilising and improving.Everyone who works in or with the PMO; days 1 to 4 of the bootcamp week
- P01–P09 · from day 5Role pathwaysPortfolio leadership, the reporting engine, integrated project controls, cost and contracts, planning and performance, risk, capability, project leadership, document control.Each learner takes the pathway for their role
- O01–O04 · 21 hSpecialist overlaysJoint ventures and partners; countries and regions; contract forms; quality, HSE, digital and sector controls.Added where they apply
- S01 · 21 hSupervised first cycleYour team runs its first live monthly cycle with an accredited trainer alongside; the outputs are assessed and debriefed.The whole PMO team
- T01 · 21 hTrain the trainerYour own people accredited to deliver, mark and coach to one standard, then observed every year.Capability Lead and nominated trainers
Every module, complete
Slides with speaker notes, an exercise pack with a knowledge check, an answer key and trainer notes, so any accredited trainer delivers the same outcomes. The supervised cycle has its supervision plan, observation record and debrief guide.
Competence assessed, not attended
Levels are set on the library’s competence scale by the functional lead: awareness, supervised practitioner, practitioner, expert. A certificate never replaces the assessment.
Kept current, kept on record
A curriculum and competence map shows every library master taught in at least one module; a course record keeps attendance, knowledge checks, exercises, feedback, certificates and the trainer register. A module is revised whenever the masters it teaches change.
All 26 modules
E01Owning the PMOF01The PMO Operating SystemF02Governance, Decision Rights and Delegated AuthorityF03PMO Roles, Accountability and CompetenceF04Data, Coding and One Version of the TruthF05The 10-Day Monthly CycleF06Reading the Integrated PositionF07From Evidence to Decision to DirectionF08The Investment LifecycleF09Assurance, Findings and LessonsF10Mobilising and Improving the PMOP01Portfolio LeadershipP02Running the Reporting EngineP03Integrated Project ControlsP04Cost, Commercial and ContractsP05Planning and PerformanceP06Risk and AssuranceP07Capability, Knowledge and the AcademyP08Project Leadership with the PMO SystemP09Running Document ControlO01Joint Ventures and PartnersO02Countries and RegionsO03Controlling Contract FormsO04Quality, HSE, Digital and Sector ControlsS01Supervised First CycleT01Train the Trainer
Module titles are the library’s own, in English.
Why put it in place now
Projects are delivered against the numbers the board can trust
Without one system, each project reports its own way and the board decides on what it is told. The sooner the PMO runs, the sooner every project reports against one validated position, problems surface while they can still be fixed, and each decision has an owner and a date.
Running in ninety days
- Day 0Five decisions start it: the Sponsor and PMO Lead named, the scope confirmed, the PMO model chosen, access granted, the plan agreed.
- Days 1 to 10Ownership established and every project listed; all 63 controls rated and the baseline signed.
- Days 11 to 30Controls stabilised: one data date, the opening cost position reconciled, the authority map approved.
- Days 31 to 60One full monthly cycle run: integrated cost and programme reviews, the first validated dashboard, the portfolio board held.
- Days 61 to 90A second cycle run, traceability tested, approvals sampled and the permanent organisation funded.
- By Day 90The first validated portfolio report and a P3M3 maturity baseline.
The 90-day mobilisation plan holds 32 actions in four phases, each closed at a gate your Sponsor signs (PCA-008).
What you get
One structure, ready on day one
The library is filed in 13 numbered folders, and every project starts from the same 20-folder template, so every project and every report looks the same. In all, the library holds 308 controlled files, the 198 templates included, and folder numbers never change.
Part A · the PMO library
Part B · the project template (20 folders)
- 00 Project Management
- 01 Governance
- 02 Business Case and Benefits
- 03 Stakeholders and Communications
- 04 Scope and Requirements
- 05 Planning and Scheduling
- 06 Cost and Finance
- 07 Risk Issues and RAID
- 08 Change Control
- 09 Reporting
- 10 Commercial and Procurement
- 11 Engineering and Technical
- 12 Quality
- 13 HSE and Sustainability
- 14 Resources and Organisation
- 15 Legal and Compliance
- 16 Information and Document Control
- 17 Handover and Operational Readiness
- 18 Assurance
- 19 Closure and Lessons
Copied for each project and renamed with its code. Programmes, countries and joint ventures have templates of their own. Open every folder and template on the PMO page
How it runs
Set up, run every month, kept honest
Set up
Six stages, each closed only on evidence: Diagnose, Stabilise, Control, Integrate, Assure, Optimise. At each gate your PMO Lead lists the evidence, an independent assessor samples it, and your Sponsor decides.
Run every month
Eighteen functions feed one control cycle on one data date: actuals by Day 2, cost and schedule reconciled by Day 4, reports signed on Day 5, validated by Day 7, the pack issued on Day 8, the board decides on Day 10.
Kept honest
Three lines kept separate: no one assures their own work, every submission is checked before it is used, status is never greener than the evidence, and approval stays with the authority.
Every project, six gates
- G0Strategic fit
- G1Select
- G2Define
- G3FID / sanction
- G4Ready for operations
- G5Close and benefits
Fitted to you: contract forms (NEC, JCT, FIDIC, ICC, IChemE, oil and gas, US and Australian forms, Gulf and Iraq public works, EPC and EPCM), countries, joint ventures, programmes, and pharma and biotech CQV and handover.

The whole system on one sheet
PCA-198 PMO Operation Map, A0
Set-up, the monthly cycle, the three lines, the six gates, the PMO Academy, what happens when something goes wrong, how maturity is proved, and the key to every library document it names: nine panels on one A0 sheet, to print or to read on screen.
PMO briefing: common questions
What does the PMO system include?
The charter and operating model; governance from the investment board to the work package; eighteen functions in four service lines; one monthly cycle on one data date; six investment gates; and overlays for contract forms, countries, joint ventures, programmes and pharma CQV. It comes as a controlled library of 198 templates in a ready-to-use folder structure, with the PMO Academy alongside.
How quickly can it be running?
Five decisions at Day 0 start it. The 90-day mobilisation plan has 32 actions in four phases: ownership by Day 10, controls stabilised by Day 30, one full monthly cycle by Day 60, and by Day 90 the first validated portfolio report and a P3M3 maturity baseline.
Who runs the PMO afterwards?
Your own people. The system is built for your team to set up, staff and run, and the PMO Academy trains them to do it, including your own accredited trainers for the people who join later.
What is the PMO Academy?
The training that sits behind the library: 26 modules in six families, from a three-hour executive briefing to a supervised first live cycle and train the trainer. Each module has slides, an exercise pack, an answer key and trainer notes, and competence is assessed rather than assumed from attendance.
Does it fit our contract forms, countries and partners?
The library carries overlays for NEC, JCT, FIDIC, ICC, IChemE, oil and gas, US and Australian forms, Gulf and Iraq public works, EPC and EPCM; a country overlay for legal, tax and currency, security, community and local content; joint venture reserved matters and partner reporting; programme tranches; and pharma and biotech CQV and handover.
What is on the A0 map?
The PCA-198 PMO Operation Map shows the whole system on one A0 sheet in nine panels: set-up, the monthly cycle, the three lines kept separate, the six gates, the PMO Academy, when something goes wrong, proof of progress, life without and with the system, and a key to every library document it names.